Ask the Experts

Q: I'm trying to commission a new pipeline, but I can’t pass the hydrostatic pressure test. How can Pure Technologies help?

Pure Technologies has established a tremendous track record in helping contractors to get a troublesome pipeline to pass a hydrostatic pressure test. The Sahara® Leak Location system has a special configuration that allows it to be drawn through the pipeline with a high-strength pull tape, allowing these ultra-sensitive inspections to be performed while a pipe is pressurized but out of service.Sahara® can pinpoint even the smallest leaks that can cause failure of a pressure test to within inches in real time, allowing for immediate and precise repair.

The biggest challenge with these inspections is often running the pull tape through the pipe after a failed pressure test, hence Pure Technologies recommends installing pull tape in new pipelines in advance of the pressure test as a precaution. This allows for rapid inspection in the event of a pressure test failing, and lets you ensure that your pipeline can be commissioned before delay penalties ensue.

- George Varga – Senior NDT Inspector

George has over 10 years of experience in the pipeline non-destructive testing industry and has been involved in developing and bringing to market a number of condition assesment technologies. For more information contact George at George.Varga@puretechltd.com.

More Questions »  Submit Question »

Disclaimer: The answers provided in the Pure Technologies "Ask the Experts" column should be considered general opinions and should not be taken as formal engineering advice. Site visits are recommended to provide answers to specific challenges that a client may be facing. Pure Technologies does not assume any responsibility for action taken by readers based on the opinions provided in this column.